Engine running · 6 subsystems live
Scenario Engine
Move the sliders and the model recalculates instantly. Whichever subsystem hits its limit first is the thing that ends the mission.
// Load Preset Mission
Mission Parameters SECTION 01
Crew Size25
Duration (days)180
EnvironmentISS-like
Life Support Configuration SECTION 02
Calories / person / day2400 kcal
Water / person / day11 L
Water recycling efficiency85%
Oxygen recycling efficiency90%
Onboard food production0% of need
Human Factors SECTION 03
Exercise complianceMed · 0.70
Habitat volume / personModerate
Privacy level40/100
Routine stability70/100
Leadership stability75/100
Can This Mission Work? PRIMARY
Modeled Mission Viability
—
CALCULATING
/100
What Fails First ONSET DAY
System
—
—
Onset
—
day
System Status 6 SUBSYSTEMS
Slide Through Time
T+ 0d · 0%
Drag to see how the crew is doing at any point during the mission.
The Actual Weight CONSUMABLES MANIFEST
Food mass
—
lb stored
Water mass
—
lb net
Oxygen
—
lb net
Total consumables
—
lb · — tons
Why This Happens DOMINANT CONSTRAINT
—